The Reporting Entity of the Asset reports generation data to TIGRS. Please ensure you are logged into the reporting entity account and not the general account if you have multiple accounts. There are two ways to report data into the Registry: Manual Generation Data Loading by Asset or via Batch Upload for multiple Assets simultaneously.
Generation Data Manual Loading:
- Go to the Meter Data Loading module and click the ‘Asset’ hyperlink under the Asset column as shown below.
- In the Self-Reporting/Facility/Project Output Data Review screen, click the ‘Add New Output’ button.
- In the Self-Reporting/Facility/Project Output Data Accept-Dispute screen, enter data for the required fields.
- Click the ‘Submit’ button.
- After clicking the ‘Submit’ button, a pop-up box will appear to confirm action. Click the ‘OK’ button to load the generation data for the asset.
Note: Generation data that is loaded and that passes the feasibility validation will automatically be placed in “TIGRS Accepted” status for review. Before RECs are issued, the Reporting Entity can either resubmit or delete Generation data.
Generation Data Batch Upload:
- Create a CSV file for Generation Data Batch Upload. You can download a copy here. The fields in the Generation Data Batch Upload CSV file must contain:
- TIGRS ID/Asset ID-If your generator ID is GEN2146, enter in 2146
- Reporting Entity Unit ID-You can find this ID on the Meter Loading module. Enter it exactly as it is shown on the module.
- Vintage-mm/01/yyyy is the correct format to enter it in. The day 01 applies to all twelves months.
- Start Date-mm/dd/yyyy is the correct format to enter it in. For the dd field, enter in 01 as the first day for the start date.
- End Date-mm/dd/yyyy is the correct format to enter in. For the dd field, enter the last day of the month.
- Total MWh-Enter the data in MWh only, no KWh.
- Go to the Meter Data Loading module in TIGRS, under the ‘Year’ drop-down, select the year, select either the ‘Generation’ Radio Button, and click the ‘Browse’ button to locate the file.
- Click the ‘Upload’ button to upload the Generation Data Batch Upload file.
- After clicking the ‘Upload’ button, a confirmation screen will appear to display and confirm the results of the upload.
Sample-Please ensure your columns look like this and that it is saved as CSV. Attached to this document is the meter data upload file that you can use for your uploads.
Note: If there are any issues with the upload, an error message will appear in the Comment section and the file will not be uploaded. If you continue to have issues, please reach out to the TIGRS administrator.